PENGENDALIAN KUALITAS GUNA MENGURANGI JUMLAH PRODUK CACAT DENGAN METODE SIX-SIGMA PT. KUSUMA MULIA PLASINDO INFITEX

RANI GULTOM, PINTO (2018) PENGENDALIAN KUALITAS GUNA MENGURANGI JUMLAH PRODUK CACAT DENGAN METODE SIX-SIGMA PT. KUSUMA MULIA PLASINDO INFITEX. Skripsi thesis, Institut Teknologi Dirgantara Adisutjipto.

[img] Text (ABSTRAK)
14020004_ABSTRAK.pdf

Download (141kB)
[img] Text (BAB I)
14020004_BAB I.pdf

Download (203kB)
[img] Text (DAFTAR PUSTAKA)
14020004_DAFTAR PUSTAKA.pdf

Download (111kB)
[img] Text (FULL SKRIPSI)
14020004 - converted.pdf
Restricted to Repository staff only

Download (955kB)

Abstract

Today's industry players are required to be able to work more efficiently and produce quality products amidst competition to meet increasingly complex consumer needs. The fulfillment of needs carried out by the company is by reducing defects in the products produced so that consumers will be happy and satisfied with the quality of the goods received. The purpose of this study is to determine the sigma level at PT. KUSUMA MULIA PLASINDO INFITEX, the factors that cause product defects, and determine an action plan in an effort to improve product quality with a kaizen approach. The methodology used is DMAIC with the stages of define, measure, analyze, improve, and control. At the define stage, the production process is mapped using the SIPOC diagram, Flow Diagram and Operational Process Map. Then the classification of types of defects and the definition of critical to quality (CTQ) are carried out. At the Measure stage, the calculation of the sigma value or level is carried out, the sigma level is 4.23σ from a scale of 1σ to 6σ with a DPMO value of 3,129.347 meters and a P-Chart control map. Furthermore, the analyze stage is carried out using a fishbone diagram, and the factors that cause defects are obtained, including from the operator (man), machine, material, method and environment. At the Improve stage, the development of an action plan is carried out using the Kaizen and New Seven Tools approaches which include the Five-M Checklist and 5W + 1H (What, Why, Where, When, Who, How) concepts, Five-step plan, Affinity diagram, Tree diagram, Relationship diagram. With the main results of the corrective action plan, especially for workers, machines, materials and the environment. The main result of the New Seven Tools analysis is that the high level of product defects is caused by the lack of strict supervision carried out by the company on workers and machines.

Item Type: Thesis (Skripsi)
Subjects: T Technology > T Technology (General)
Divisions: Institut Teknologi Dirgantara Adisujtipto > Teknik Industri
Depositing User: Mr PINTO RANI GULTOM
Date Deposited: 26 Aug 2024 04:05
Last Modified: 26 Aug 2024 04:05
URI: http://eprints.stta.ac.id/id/eprint/2610

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year