PERENCANAAN EFISIENSI MAN HOURS PADA PERAWATAN C-CHECK 02 PESAWAT ATR 72-600 (PK-WHK) MENGGUNAKAN METODE CRITICAL PATH METHOD (CPM) DI PT. BATAM AERO TECHNIC

Tebing Thursina, Taufiq (2022) PERENCANAAN EFISIENSI MAN HOURS PADA PERAWATAN C-CHECK 02 PESAWAT ATR 72-600 (PK-WHK) MENGGUNAKAN METODE CRITICAL PATH METHOD (CPM) DI PT. BATAM AERO TECHNIC. Thesis thesis, Institut Teknologi Dirgantara Adisutjipto.

[img] Text (ABSTRAK)
18050026_ABSTRAK.pdf

Download (67kB)
[img] Text (BAB I)
18050026_BAB I.pdf

Download (1MB)
[img] Text (DAFTAR PUSTAKA)
18050026_DAFTAR PUSTAKA.pdf

Download (132kB)
[img] Text (FULL SKRIPSI)
18050026.pdf
Restricted to Repository staff only

Download (2MB)

Abstract

Atr 72-600 is one of the many small built aircraft in Indonesia. The aircraft, of course, needs maintenance to reduce the risk of accidents and system failures. The precision of time and efficiency of the care involved are the main factors for the aircraft to operate on time, thus optimizing the number of mechanics according to the workload. This analysis involves the use of the critical path method (CPM) by working forward and backward calculations to get the critical path result (slack). Analysis followed by an efficiency calculation: The results of that analysis are compared with those of the company. Based on analysis, the value of the man hours was needed at 619.09 man hours, whereas the value of the man hours was 926.88 man hours. There are discretions the man hours obtained from a company of 307.78 hours. The value of the man hours' efficiency was coupled with a c-check 02 care of 33.21%.

Item Type: Thesis (Thesis)
Subjects: T Technology > T Technology (General)
Depositing User: Mr taufiq tebingthrusina
Date Deposited: 27 Feb 2024 02:07
Last Modified: 27 Feb 2024 02:07
URI: http://eprints.stta.ac.id/id/eprint/1159

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year