PERHITUNGAN TURN ARROUND TIME BARU A-CHECK MAINTENANCE PADA PESAWAT BOEING 737-500

Rivanaldi Irawan, Septiansyah (2023) PERHITUNGAN TURN ARROUND TIME BARU A-CHECK MAINTENANCE PADA PESAWAT BOEING 737-500. Thesis thesis, Institut Teknologi Dirgantara Adisutjipto.

[img] Text (ABSTRAK)
17050110_ABSTRAK.pdf

Download (7kB)
[img] Text (BAB I)
17050110_BAB 1.pdf

Download (129kB)
[img] Text (DAFTAR PUSTAKA)
17050110_DAFTAR PUSTAKA.pdf

Download (184kB)
[img] Text (FULL SKRIPSI)
17050110.pdf
Restricted to Repository staff only

Download (4MB)

Abstract

PT. Merpati Maintenance Facility (MMF) is a maintenance company that is quite large and has been around for a long time, namely in 1991, MMF is always trying to be as efficient and effective as possible to complete orders for various requests from customers. For manhours efficiency is one factor that needs to be consideredin doing the job. This study discusses TAT, TAT can be obtained through the MPD, by multiplying the MPD value by the multiplier. In this discussion, looking for anew multiplier factor to be used to find the TAT value, which then uses the linear programming method. The multiplier is the value unit used by the planner in finding the manhours plan, while linear programming is used to find the value of the multiplier that has been determined by the planner. From the results of this study, the TAT value was obtained for 12 hours. And it is expected that more efficiency from the new planner.

Item Type: Thesis (Thesis)
Subjects: T Technology > T Technology (General)
Divisions: Institut Teknologi Dirgantara Adisujtipto > Teknik Dirgantara
Depositing User: Mr SEPTIANSYAH RIVANALDI IRAWAN
Date Deposited: 15 Feb 2024 08:13
Last Modified: 15 Feb 2024 08:13
URI: http://eprints.stta.ac.id/id/eprint/1000

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year