Utomo, B.W. (2019) THESIS COMPLETION ANALYSIS USING OPTIMISTIC BIAS POSSIBILITY. In: Prosiding Seminar Nasional Teknologi Informasi dan Kedirgantaraan : Peran Teknologi untuk Revitalisasi Bandara dan Transportasi Udara. Prosiding Seminar Nasional Teknologi Informasi dan Kedirgantaraan : Peran Teknologi untuk Revitalisasi Bandara dan Transportasi Udara, V . Sekolah Tinggi Teknologi Adisutjipto, Yogyakarta. ISBN ISBN 978-602-52742-1-3
Text
303-1648-1-PB (1).pdf Download (567kB) |
Abstract
Thesis is a condition that must be fulfilled by prospective graduates to be able to get a bachelor's degree. This study uses optimistic bias because in general humans experience overestimation (optimistic bias) on things that are considered as positive events, but underestimate (pessimistic biases) on negative events. This study uses the completion time of the Final Project Report as a case study. The results of this study are that there are systematic errors / biases in the accuracy data at the estimated time of completion of the final project. Accuracy time occurs Optimistic bias because the estimated value tends to be smaller when compared with the actual time value. Statistically it can be concluded that there is no difference in the accuracy of the estimated data completion of final assignments between male and female students. Keyword: Project Time Estimation, Optimistic bias, Thesis
Item Type: | Book Section |
---|---|
Subjects: | T Technology > T Technology (General) |
Divisions: | Sekolah Tinggi Teknologi Adisujtipto > Teknik Industri |
Depositing User: | Mr Bagus Wahyu Utomo |
Date Deposited: | 18 Sep 2020 00:44 |
Last Modified: | 18 Sep 2020 00:44 |
URI: | http://eprints.stta.ac.id/id/eprint/329 |
Actions (login required)
View Item |
Downloads
Downloads per month over past year