RELAYOUT TATA LETAK FASILITAS DAN MATERIAL HANDLING MENGGUNAKAN METODE ACTIVITY RELATIONSHIP CHART (ARC) PADA BAGIAN PRODUKSI DI UPT LOGAM IKM BU YESSI YOGYAKARTA

Zaki Alghifari, Muhammad (2023) RELAYOUT TATA LETAK FASILITAS DAN MATERIAL HANDLING MENGGUNAKAN METODE ACTIVITY RELATIONSHIP CHART (ARC) PADA BAGIAN PRODUKSI DI UPT LOGAM IKM BU YESSI YOGYAKARTA. Thesis thesis, Institut Teknologi Dirgantara Adisutjipto.

[img] Text (ABSTRAK)
19020005_ABSTRAK.pdf

Download (7kB)
[img] Text (BAB I)
19020005_BAB 1.pdf

Download (77kB)
[img] Text (DAFTAR PUSTAKA)
19020005_DAFTAR PUSTAKA.pdf

Download (123kB)
[img] Text (FULL SKRIPSI)
19020005.pdf
Restricted to Repository staff only

Download (2MB)

Abstract

The layout is one of the operational strategic decisions that also determines the efficiency of the company's operations in the long term. A good layout will contribute to increasing company productivity. The purpose of this research is to understand the stages of the production process and then to identify the constraints related to the layout at IKM Yessi and submit a proposed layout that is by the use of the Activity Relationship Chart, to determine the degree of closeness relationship between work stations. Then propose adding material handling to facilitate product transfer. From the results of the analysis, it was found that the proposed layout has advantages, namely the flow of the production process in accordance with the stages of the production process, workers have a wider workspace, such as a sand mold that has less space and more organized road access. The time comparison between the initial layout which has a total time of 132 seconds or 2 minutes 12 seconds, and the new layout which has a total time of 127 seconds or 2 minutes 7 seconds, has a faster time difference of 5 seconds in the new layout. In addition to the proposed layout, there are also suggestions for additional material handling which are expected to make it easier for employees according to their working needs. With the analysis of the total transfer time, the result is a difference in time of 5 minutes 41 seconds, it is faster using material handling.

Item Type: Thesis (Thesis)
Subjects: T Technology > T Technology (General)
Divisions: Institut Teknologi Dirgantara Adisujtipto > Teknik Industri
Depositing User: Mr Muhammad zakialghifari
Date Deposited: 27 Feb 2024 03:11
Last Modified: 27 Feb 2024 03:11
URI: http://eprints.stta.ac.id/id/eprint/1214

Actions (login required)

View Item View Item

Downloads

Downloads per month over past year